Read what our customers have to say about working with simus systems and their experiences with our projects.

“In a performance test, we determined that we were able to halve the time required for calculating and creating the routing for each component. In addition, the high performance of the system eliminates waiting times, for example when transferring to SAP.”

To the success story >>

Logo Hauser

“You have to invest a lot of time and thought in master data management, but it pays off immediately. The excellent cooperation with the competent and friendly consultants from simus systems contributed a lot to the successful course of the project.”

To the success story >>

“Knowing the costs early on in the design phase saves six months on new projects. In doing so, we reduce the time spent on cost estimates by 98 percent.”

“Around 1.5 million work plans and calculations have already been created with simus classmate – including many existing components that can now be reused together with the work plan. This would have taken us 305,000 hours or 180 man-years to do manually.”

To the success story >>

Logo RK Rose+Krieger

“The straightforward ability to determine the manufacturing costs quickly for each component and know where a project stands in terms of costs saves on a lot of time and effort.”

To the success story >>

Logo Rhätische Bahn

The ability to quickly find all the objects facilitates and accelerates the diverse range of tasks involved in maintenance, servicing and repair.

To the success story >>

“We are particularly impressed by the range of application this solution can be used for. classmate PLAN is a centerpiece in designing our manufacturing process more lightweight, flexible, and cost-effective.”

To the success story >>

“Instead of going through numerous drawings or searching the database, users can list all relevant parts in one search filter with one click in 10 seconds. It was well-accepted as it was much easier and quicker.”

To the success story >>

“The previous process of checking costs with several supplier inquiries, without a real procurement case, took up to three weeks. Now, the designers achieve their target in a few minutes. It also accelerated the preparation of quotes for customers. Most importantly, we can now already influence costs at design stage.”

To the success story >>

“For about 80 percent of our parts, simus classmate calculates the manufacturing costs in advance with a success rate of 95 percent. The designing engineers generate their own knowledge and achieve their cost objectives increasingly well. As a consequence, we have more time for special cases, necessary ground work or value engineering.”

To the success story >>

“We are particularly taken with the expertise, powerful software tools, and simus systems’ customer focus. These are the best conditions to finish a project successfully and on time.”

To the success story >>

pester pac automation

“A perfect working environ­ment in which our engineers can focus on their core designing tasks.”

“simus systems has faced new challenges successfully. You can sense the drive for continuous self-improvement.”

To the success story >>

“We are particularly pleased with the increased reuse rate achieved by the data cleansing. The ideal support for our common-part strategy.”

“Thanks to the expert support and the excellent software tools by simus systems, we could migrate our data into the new SAP system – quick and easy.”

To the success story >>

Ammann Group

“In the past, we searched for purchase parts – today, we find them.”

To the success story >>

“With the help of simus classmate as the central data management system, we can achieve significantly faster product cycles.”

To the success story >>